Click here for Locker Group Home Page
Locker Group: Wire Mesh Specialists
Home Quality Wire Mesh Care & Maintenance Contact Us Site Map
Locker Group: Wire Mesh Specialists
Click here for Locker Group Home Page

Project: Flare Deck Heat Shielding

Project Name: Total E & P Nigeria Limited AMT2 Flare Deck

The Locker Flare Deck panels are due for installation in September 2009.

Flare Deck panels as laid out in our factory for inspection prior to being shipped to Nigeria

 

 

 

 

 

 

 

 

 

 

 

 

The Original Flare Deck had no protection and the supporting steelwork has been damaged by the elevated temperatures present. Numerous interim modifications have been employed in an attempt to strengthen the structure but it has now been decided to Instal Locker Flare Deck protection.

The image above shows the Flare Deck panels as laid out in our factory for inspection prior to being shipped to Nigeria. The Locker Flare Deck panels are due for installation in September 2009.


 

© 2012 Locker Heatshielding Ltd | Privacy Policy and Site Terms of Use
Site designed, hosted and maintained by Beech Web Services