Total E & P Nigeria AMT2 Platform, Nigeria









About the Project
Total E & P Nigeria contacted Locker in August 2008 regarding a problem with the AMT2 flare deck.
The Original Flare Deck had no Heatshield protection and the supporting steelwork was damaged by the elevated temperatures present. Numerous interim modifications were employed in an attempt to strengthen the structure but Locker Flare Deck protection was agreed as the best solution.
The replacement flare deck provided unique challenges in that the panels had to be shaped around the existing structure, and modifications undertaken over the years meant incorporation of a number of complex shapes.
These panels were designed, fabricated and delivered to a tight budget and delivery schedule, and subsequently installed within the specified period. Successful fulfilment of complex requirements strengthened our relationship with Total E&P in the West African region and further demonstrated our ability to meet any challenge asked of us.
Click to download PDF Project Sheet: Total E&P Nigeria AMT2 Platform.