+44 (0)1925 406614 sales@heatshielding.com FacebookTwitter

Open post

Bacton Gas Terminal

Bacton Gas Terminal, UK


previous arrow
next arrow
previous arrownext arrow
Slider

About the Project


Locker were contacted in 2016 by Interconnector to provide a safe escape route from the adjacent building to a safe muster point in the event of major event at their Bacton Gas Terminal.

Click to download PDF Project Sheet: Bacton Gas Terminal.

Deliverables
Locker provided a total of 66 Double Skin Ladder (side) and Single Skin Mini ES shields (roof) to protect an escape route with a total length of 75m.

The Heatshields were designed and manufactured to stringent controls and a tight deadline to facilitate the customer’s planned plant maintenance schedule, and the project marked another successful key onshore project for Locker Heatshielding.

Scroll to top